adaptor brass cond 20mm 3/4in.

Cable Management Machined Brass, 20Mm Male To 3/4 Inch Female Brass Adaptor

Catalogue Number: 1235/20R
adaptor brass cond 20mm 3/4in.
Colour:
Colour: Per UOM Std.
  • 1 PCE

Specifications

hide show
Product brand
Clipsal
Material
brass
Connector type
thread connector
Product destination
diameter: 20-20 mm tube
Length
35-35 mm
Standards
  • AS 1721
  • AS 2052
  • AS 1722.2
  • ASC 66.1
    • REACh Regulation
      Free of Substances of Very High Concern above the threshold
      REACh free of SVHC
      Yes
      EU RoHS Directive
      Pro-active compliance (Product out of EU RoHS legal scope)
      Toxic heavy metal free
      Yes
      Mercury free
      Yes
      RoHS exemption information
      Yes
      China RoHS Regulation
       Pro-active China RoHS declaration (out of China RoHS legal scope)

      Frequently Asked Questions

      hide show

      What is the thread type on a 1235/25?

      The thread type on a 1235/25 is BS - British Standard.

      For more information, please refer to the link:
      https://www.clipsal.com/Trade/Products/ProductDetail?catno=1235/25 

      What is part number for lid to suit 1239/20/4?

      Part number 1239L20 will suit any of 1239/20 series.

      Whati s pitch thread for part number 1245/25?

      Pitch thread is 1.5mm

      Is there a 32A version of the 1439/20?

      No, 20A is the largest size in this model plug.

      Can a three pole breaker be used on a single phase (two-wire) load in a three phase panel?

      Issue:
      Product design

      Product Line:
      Molded Case Circuit Breakers

      Environment:  
      Square D Circuit Breakers

      Cause:
      Application

      Resolution:
      Yes.  According the UL White Book (Product Category DIVQ), multipole common trip circuit breakers rated 125/250V are suitable for use for a single-phase multiwire circuit, with or without the neutral connected to the load.  Courtesy of Mike Holt Enterprises 2008

      What is the part code for the cord connector to suit the PDL56P320F?

      We do not do one this size and with flat pins in 56 series
      clipsal option (not IP rated)
      438/20-WE - extention socket 20A
      1439/20 - 20A plug
       

      Can the PowerLogic Energy Meter be used to monitor multiple loads?

      Issue
      A user would like to totalize multiple loads with an Energy meter.

      Product Line
      Powerlogic Energy Meter

      Environment
      Energy Meter Installation

      Cause
      The installation guide for the Energy meter does not contain instructions on wiring the meter to monitor multiple loads.

      Resolution
      *Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death. 

      The Energy meter is calibrated with the set of CTs that are included with the meter, however the Energy Meter can be installed with up to three sets of parallel CTs to monitor multiple loads. When wiring multiple current transformers in parallel to the Energy Meter, all voltages corresponding to the individual loads must be the same voltage values and must be from the same source. The voltage applied to the inputs of the Energy Meter will be used in the power calculations. Monitoring different voltage values and monitoring the same voltage values from different sources will both cause the power calculations to be inaccurate.

      For example, if load A has a system voltage type of 120/208 VAC, and load B has a system voltage type of 277/480 VAC, an Energy Meter cannot be used to measure both loads in a parallel configuration. Likewise, if Load A and Load B both have a system voltage type of 120/208 VAC, but are supplied their respective voltage from different transformers, an Energy Meter cannot be used to measure both loads in a parallel configuration.

      Note: When multiple sets of CTs are connected in parallel to the Energy Meter, the accuracy drops from less than 1% to between 1%-3%.


      Please follow the guidelines in the attached addendum for selecting and installing the parallel CTs on an Energy meter.

      Can you hardwire the input/output of the Matrix-UPS?

      Issue:
      Can the input or output of a Matrix UPS be hardwired?

      Product Line:
      Matrix UPS

      Environment:
      All serial ranges

      Cause:
      A user may wish to hardwire the input/output of the UPS rather than use the supplied input power cord.

      Resolution:
      APC offers a hardwire kit to be used with the 120/208 Matrix-UPS product. The part #s for these kits are as follows:

      MXA001: 5kVA Hardwire kit
      MXA002: 3kVA Hardwire kit

      These hardwire kits replace the standard back plate and allows the input and output of the Matrix to be wired directly to their corresponding electrical panels. This kit provides 120V, 208V and 240V on the output. The electrical specifications for both the Matrix 3kVA and Matrix 5kVA UPS systems are as follows:

      Input Over-current Protection
      3kVA: 20 A
      5kVA: 30 A

      Input/Output Wire Size
      3kVA: 12 AWG
      5kVA: 10 AWG


      How do I hardwire 10kva and 20kva transformers in a 208/120 or 240/120 environment

      Issue:
      Implementing a hardwire stepdown transformer in a 208v or 240v environment


      Product Line:

      Smart-UPS / Symmetra

      Environment:

      APTF10KT01, APTF10KW01, and APTF20KW01, All Serial Numbers

      Cause:

      Unbalanced UPS outputs require a stepdown transformer to power 120v loads


      Resolution:

      This document refers to installing  the APTF10KT01, APTF10KW01, and APTF20KW01 transformers in a North American 120/240 or 120/208 environment. For installations in other regions please consult the users manual.

      The wiring block outputs are as follows:


      For domestic use, make sure that the Terminal Block Jumper is installed between the Ground Terminal and Terminal 8 on the output wiring block, as illustrated on page 8 of the user manual. Please also make sure that the input voltage switch is in the correct position.

      The step-down transformer provides 240/120 output as 2 120v hots, a neutral, and a ground. It provides 208v output as a 120v hot, an 88v hot, and a ground. The 120v hot (terminal  7) and the 88v hot (terminal 9) are 180 degrees out of phase. You will measure 208v from terminals 7 to 9. The step-down transformer is not able to provide 2 120v hots that are 120 degrees out of phase as you would see with utility power.



       Note: If your installation requires both 208v and 120v output power you will need 2 separate subpanels: a 240v/120v panel and a dedicated 208v subpanel.