cement joint pvc 125ml blue

Cable Management PVC Medium Gap Filling Blue Cement, 125Ml Bottle With Brush

Catalogue Number: 240/125BU
cement joint pvc 125ml blue
Colour:
Colour: Per UOM Std.
  • 1 PCE

Specifications

hide show
Product brand
Clipsal
Sustainable offer status
Green Premium product
REACh Regulation
Free of Substances of Very High Concern above the threshold
REACh free of SVHC
Yes
EU RoHS Directive
Pro-active compliance (Product out of EU RoHS legal scope)
Toxic heavy metal free
Yes
Mercury free
Yes
RoHS exemption information
Yes
China RoHS Regulation
 Pro-active China RoHS declaration (out of China RoHS legal scope)
Environmental Disclosure
ENVPEP100802EN

Frequently Asked Questions

hide show

What is the part number for a plug to suit the 240/25?

The part number for a plug to suit the 240/25/3 is a 220/25.
 

What is the rating of transformer in the PDL shaver sockets

Rating are 240/115V 20va

What is the difference between 240/500BU and the 240/500CL?

The only difference between the 240/500BU and the 240/500CL is the colour only. The materials and chemicals used are the same.

Some of the key features are:

  • Medium Gap Filling
  • 500ml Bottle
  • Comes with Brush for easy application
  • Available in Clear or Blue
For further informaation please visit www.clipsal.com/Trade/Products/ProductDetail?catno=240/500CL

 

How do I hardwire 10kva and 20kva transformers in a 208/120 or 240/120 environment

Issue:
Implementing a hardwire stepdown transformer in a 208v or 240v environment


Product Line:

Smart-UPS / Symmetra

Environment:

APTF10KT01, APTF10KW01, and APTF20KW01, All Serial Numbers

Cause:

Unbalanced UPS outputs require a stepdown transformer to power 120v loads


Resolution:

This document refers to installing  the APTF10KT01, APTF10KW01, and APTF20KW01 transformers in a North American 120/240 or 120/208 environment. For installations in other regions please consult the users manual.

The wiring block outputs are as follows:


For domestic use, make sure that the Terminal Block Jumper is installed between the Ground Terminal and Terminal 8 on the output wiring block, as illustrated on page 8 of the user manual. Please also make sure that the input voltage switch is in the correct position.

The step-down transformer provides 240/120 output as 2 120v hots, a neutral, and a ground. It provides 208v output as a 120v hot, an 88v hot, and a ground. The 120v hot (terminal  7) and the 88v hot (terminal 9) are 180 degrees out of phase. You will measure 208v from terminals 7 to 9. The step-down transformer is not able to provide 2 120v hots that are 120 degrees out of phase as you would see with utility power.



 Note: If your installation requires both 208v and 120v output power you will need 2 separate subpanels: a 240v/120v panel and a dedicated 208v subpanel.

What is the part number of a Junction box with 25mm entry but entries in U shape?

Unfortunately we dont make U entry junction box any more, closest will be 240/25/2A and similar.

What is the part number for a 25mm conduit plug?

The part number for a 25mm conduit plug is - 220/25

For further information , visit link below:-
https://www.clipsal.com/Trade/search-results?q=220/25
User-added image

What is the part number for a 25mm extension ring for the round conduit J-boxes?

The part number for a 25mm extension ring for the round conduit J-boxes is - 249/25

For further information visit link below:-
https://www.clipsal.com/Trade/search-results?q=249/25
User-added image

What is the size of the inter conductor for the N-series recloser cables (38kV)?

This size will vary depending upon the rating of the conductors:


  • 1. 250A 80mm2
    2. 340A 120mm2
    3. 400A 180mm2
    4. 630A 240mm2
    5. 800A 400mm2

    These are shown in more detail in the attached guide.

    Olex cables.pdfOlex cables.pdf


Legacy KB System (APS) Data: RESL212274 V1.0, Originally authored by DaFr on 08/09/2013, Last Edited by DaFr on 08/09/2013
Related ranges: Others protection relays

SRT 8 or 10kVA reports Error P.11 or DC Bus Soft Start or event codes 124/125

Issue: The UPS reports P.11 or DC Bus Soft Start - event 124/125



Product Line: SRT 8-10kVA Models 

Resolution:
Clear the Alarm. Turn the output ON again. If the problem persists, Brain dead the UPS. If the alarm reoccurs, perform a UPS Firmware upgrade to the latest 04.7 revision that addressed these issues. For complete upgrade instructions please refer to FA164737.
 
Release Notes (UPS 04.7):
========================
1. Improved system performance of transitions between Online and Bypass operation modes.
2. Improved system behaviour for three phase input configurations to reduce transitions to battery under certain input feed conditions.
3. Improved system behaviour to eliminate false detection of DC bus under voltage alarm under certain conditions.
4. Improved system handling for certain AC input conditions during system start-up.