Cable Management Fixing Accessories, 25mm Zinc Plated Metal Half Saddle

Cable Management Fixing Accessories, 25mm Zinc Plated Metal Half Saddle

Cable Management Fixing Accessories, 25mm Zinc Plated Metal Half Saddle

Item Number: 180A25

Retail
$0.89
RRP (Inc. GST)

Datasheet

Barcode

Qty UoM EAN Colour
-
-
-

Specifications

Design

Product brand

Clipsal

Surface treatment

zinc plated

Physical

Length

60 mm

Width

25 mm

Height

66 mm

REACh free of SVHC

Yes

EU RoHS Directive

Pro-active compliance (Product out of EU RoHS legal scope)

Toxic heavy metal free

Yes

Mercury free

Yes

RoHS exemption information

Yes

China RoHS Regulation

 Pro-active China RoHS declaration (out of China RoHS legal scope)

Material

Material

steel

Others

Diameter

25 mm

Package 1 Weight

22 g

Package 1 Height

26 mm

Package 1 width

25 mm

Package 1 Length

59 mm
Show all specifications

Frequently Asked Questions

hide show

Are the Clipsal Conduit Clips available in Electric Orange?

No, they are only available in grey.

This applies to the 280/16 (16mm), 280/20 (20mm), 280/25 (25mm), 280/32 (32mm), 280/40 (40mm) and 280/50 (50mm).

Is the calibration equipment for PowerLogic and ION meters ISO 17025 certified?

Issue
ISO 17025 certification for calibration equipment used for PowerLogic and ION meters

Product Line
PowerLogic Meters
ION Meters

Environment
ISO 17025 Certification

Cause
Customer is unable to find certification for Schneider Electric’s calibration equipment used for the PowerLogic ION meters

Resolution
PowerLogic and ION meters' calibration equipment is not currently certified per ISO 17025 standards. The reason for this is that the calibration houses (e.g. 3rd party) are required to meet ISO 17025 certification standards as well. Not all the calibration houses used for PowerLogic and ION meters meet these requirements; Schneider Electric, therefore, is not able to attain ISO 17025 certification on PowerLogic and ION meters.

The ION meters are shipped from the factory with a certificate of compliance and calibration. In the event that this certificate was lost or never recieved, a copy can be obtained by providing the meter's serial number and sending the request to technical support.

When installing the PowerChute Business Edition Server, the configuration wizard does not launch on Windows Storage Server 2008 or Windows Small Business Server 2008.

Issue:
When installing the PowerChute Business Edition Server, the configuration wizard does not launch

Product:
PowerChute Business Edition

Environment:
Windows Storage Server 2008 or Windows Small Business Server 2008

Cause:
The 8.3 file name format is not supported by default on these two operating systems but the wizard needs it enabled in order to run correctly.

For information on Windows 8.3 file naming convention please see Windows File and Directory Names

Solution:

To enable this format on Windows Storage Server 2008 and Windows Small Business Server 2008, follow these steps:

1. Type this at the command prompt with administrator privileges.

     C:\>fsutil behavior set disable8dot3 0

2. Reboot Windows

3. Confirm the enabling of the 8.3 file name format by typing this and pressing Enter:

    C:\>fsutil behavior query disable8dot3
    
    The following should then display.     disable8dot3 = 0

(If it states"" = 1"", then 8.3 is still not enabled, please repeat).
 

PME 9.0 Fails at Verify Databases Step

Issue:
During the install for PME 9.0 user gets error at Verify Databases step. This is shown in the picture below. 


The Installation Log contains the following error:
""END OF POST-DEPLOYMENT STAGE" was NOT found in C:\Program Files (x86)\Schneider Electric\Power Monitoring Expert\Database\Diagnostic\ION_Data_Upgrade.log" 

The ION_Data_Upgrade.log file contains the following:
Changed database context to 'master'.
Creating ION_Data...
Msg 5123, Level 16, State 1, Server VWMERION01P\ION, Line 1
CREATE FILE encountered operating system error 5(Access is denied.) while attempting to open or create the physical file 'C:\Program Files (x86)\Schneider Electric\Power Monitoring Expert\Database\ION_Data.MDF'.
Msg 1802, Level 16, State 4, Server VWMERION01P\ION, Line 1
CREATE DATABASE failed. Some file names listed could not be created. Check related errors.

Product:
PME 9.0


Resolution:
Add the windows user running the installer to the Schneider Electric -> Power Monitoring Expert folder with full control. This can be done by right clicking on the folder and going to Properties -> security. 
 

Updated: Why is my Network Management Card losing SNMPv3 communication?


Issue

My Network Management Card (NMC) is losing SNMPv3 connectivity after a certain amount of time but other communication protocols (web, FTP, SSH, Telnet, SNMPv1, etc) continue to work properly.


Product Line

 

  • Network Management Card 1 (NMC1) - AP9617, AP9618, AP9619
    Devices with an embedded Network Management Card 1 include (but are not limited to): Metered/Switched Rack PDUs (AP78XX, AP79XX), Rack Automatic Transfer Switches (AP77XX, Environmental Monitoring Units (AP9320, AP9340, NetBotz 200)
     
  • Network Management Card 2 (NMC2) - AP9630/AP9630CH, AP9631/AP9631CH, AP9635/AP9635CH
    Devices with an embedded Network Management Card 2 include (but are not limited to): 2G Metered/Switched Rack PDUs (AP86XX, AP88XX, AP89XX), Certain Audio/Video Network Management Enabled products.
     
Environment
 
  • All serial numbers
  • Any device listed above utilizing SNMPv3
  • NMC1 AOS v3.7.0 and below; NMC2 AOS v5.0.X and below
  • NMC1 AOS v3.7.3 and higher


Cause

An issue has been identified with the SNMPv3 task on Network Management Card 1 and 2 based devices. SNMPv3 communication will be lost after approximately 49 days and 17 hours. The NMC will continue to run normally, with the exception of the SNMP process, which will not run.


Resolution

Update (July, 2016): Specific to NMC1 products, this issue had previously been fixed for AOS 3.7.3 and higher. The maximum SNMPv3 uptime allowed was modfied from 49.7 days to 497 days. At the 497 uptime day mark, assuming the management uptime had reached this point, the Network Management Card interface would have had to be rebooted though the web, CLI, or SNMPv1 interfaces in order to regain SNMPv3 communication. NMC2 AOS v5.1.X also contained a fix to avoid an SNMPv3 communication loss completely.

With NMC1 AOS v3.9.2 and higher, this issue has been fully resolved and the 497 uptime limitation has been lifted and SNMPv3 communication through StruxureWare Data Center Expert or any third party SNMPv3 NMS will not be affected after 497 days of uptime. This AOS (or newer) will be released for different firmware applications in the coming months which are available at https://www.apc.com/tt/en/tools/download/. Certain applications are available immediately, such as Rack PDU.
 

How to configure the SRC 5,6,8 & 10 KVA UPS Models External Battery Packs using the LCD display

Issue:

Configuration of SRC battery packs via the LCD display  

Product Line:

Smart-UPS Online

Environment:

All SRC models, All Serial Numbers

Cause:

Batteries need to  be manually added to the UPS in order for the unit to properly calculate runtime

Resolution:
 

Procedure for Configuring the number of battery strings through the display interface or LCD menus:


1. Press the Enter key to select the main menu.

2. Scroll down to configuration.

3. Press the enter key to select configuration. 

4. Scroll down to battery setup by number of battery pack. 

5. Enter the correct number of attached battery packs.


In order to setup the external battery packs, please key in as (Ah of battery) x (total number of batteries).

Example 1:   If there are 16pcs of 5Ah battery in series (for 5kVA), the total Ah number is 5Ahx16pcs=80Ah.
Example 2:   If there are 16 pcs of 100 AH batteries in series(for 5 KVA), the total AH number is 100 AH x 16 pcs=1600 AH
Example 3:   If there are 2 strings of 16pcs of 5Ah battery in series (for 5kVA), the total Ah number is 5Ahx16pcsx2 strings=160Ah.
  
The 80Ah inside the table is the default setting for 5kVA/6kVA (1 EXB: 16pcs of 5Ah battery)
The default setting for 8kVA is 140Ah (1 EXB: 20pcs of 7Ah battery)
The default setting for 10kVA is 180Ah (1 EXB: 20pcs of 9Ah battery).
  
If “Ext total battery Ah” is set as 0, it means there is no external battery connected. 
 
        

"
Show More