Quantcast

Cable Management Machined Brass, 20mm Male to 3/4 Inch Female Brass Adaptor

Cable Management Machined Brass, 20mm Male to 3/4 Inch Female Brass Adaptor

Cable Management Machined Brass, 20mm Male to 3/4 Inch Female Brass Adaptor

Item Number: 1235/20R

Retail
N/A
RRP (Inc. GST)

Datasheet

Barcode

Qty UoM EAN Colour
-
-
-

Specifications

Design

Sustainable offer status

Green Premium product

Product brand

Clipsal

Product destination

diameter: 20-20 mm tube

Physical

Mercury free

Yes

REACh free of SVHC

Yes

REACh Regulation

Free of Substances of Very High Concern above the threshold

China RoHS Regulation

 Pro-active China RoHS declaration (out of China RoHS legal scope)

EU RoHS Directive

Pro-active compliance (Product out of EU RoHS legal scope)

RoHS exemption information

Yes

Environmental Disclosure

ENVPEP110719EN

Toxic heavy metal free

Yes

Connector type

thread connector

Length

35-35 mm

Standards

  • AS 1721
  • AS 2052
  • AS 1722.2
  • ASC 66.1
    • Material

      Material

      brass

      Others

      Package 1 Weight

      0.047 kg
      Show all specifications

      Frequently Asked Questions

      hide show

      What is the thread type on a 1235/25?

      The thread type on a 1235/25 is BS - British Standard.

      For more information, please refer to the link:
      https://www.clipsal.com/Trade/Products/ProductDetail?catno=1235/25 

      What is part number for lid to suit 1239/20/4?

      Part number 1239L20 will suit any of 1239/20 series.

      Whati s pitch thread for part number 1245/25?

      Pitch thread is 1.5mm

      Can a three pole breaker be used on a single phase (two-wire) load in a three phase panel?

      Issue:
      Product design

      Product Line:
      Molded Case Circuit Breakers

      Environment:  
      Square D Circuit Breakers

      Cause:
      Application

      Resolution:
      Yes.  According the UL White Book (Product Category DIVQ), multipole common trip circuit breakers rated 125/250V are suitable for use for a single-phase multiwire circuit, with or without the neutral connected to the load.  Courtesy of Mike Holt Enterprises 2008

      What is the part code for the cord connector to suit the PDL56P320F?

      We do not do one this size and with flat pins in 56 series
      clipsal option (not IP rated)
      438/20-WE - extention socket 20A
      1439/20 - 20A plug
       

      Can the PowerLogic Energy Meter be used to monitor multiple loads?

      Issue
      A user would like to totalize multiple loads with an Energy meter.

      Product Line
      Powerlogic Energy Meter

      Environment
      Energy Meter Installation

      Cause
      The installation guide for the Energy meter does not contain instructions on wiring the meter to monitor multiple loads.

      Resolution
      *Warning: Installation and maintenance of this device should only be performed by qualified, competent personnel that have appropriate training and experience with high voltage and current devices. Failure to follow the instructions / warnings in the Meter Installation Guide can result in permanent damage to the meter, severe injury or death. 

      The Energy meter is calibrated with the set of CTs that are included with the meter, however the Energy Meter can be installed with up to three sets of parallel CTs to monitor multiple loads. When wiring multiple current transformers in parallel to the Energy Meter, all voltages corresponding to the individual loads must be the same voltage values and must be from the same source. The voltage applied to the inputs of the Energy Meter will be used in the power calculations. Monitoring different voltage values and monitoring the same voltage values from different sources will both cause the power calculations to be inaccurate.

      For example, if load A has a system voltage type of 120/208 VAC, and load B has a system voltage type of 277/480 VAC, an Energy Meter cannot be used to measure both loads in a parallel configuration. Likewise, if Load A and Load B both have a system voltage type of 120/208 VAC, but are supplied their respective voltage from different transformers, an Energy Meter cannot be used to measure both loads in a parallel configuration.

      Note: When multiple sets of CTs are connected in parallel to the Energy Meter, the accuracy drops from less than 1% to between 1%-3%.


      Please follow the guidelines in the attached addendum for selecting and installing the parallel CTs on an Energy meter.
      Show More