MASTER YOUR CASTLE with your new build or reno project
Enter competition

If I export a project from Concept as 'Re-connect to Equal' and move it to another PC, import and connect to the PLC, why am I in a 'Modified' state rather than an 'Equal' state?

FA197386

24/01/2018

This can occur if the Preferences are not the same on each Concept session. For example, PC1 may 'allow leading digits' while PC2 does not. Go to 'Options', 'Preferences' and make sure both PCs match.


Legacy KB System (APS) Data: RESL169227 V1.0, Originally authored by on , Last Edited by on
Related ranges: Concept