MASTER YOUR CASTLE with your new build or reno project
Enter competition

Why is the 'Optimize Project' option grayed out in Concept?

FA197191

24/01/2018

In order to optimize a project the project must be closed. Once the project is closed, choose File>>Optimize Project and navigate to the location of the project on your computer.
NOTE: Optimizing a project will cause Concept and the PLC to become 'Not Equal' and will require that you stop the PLC and perform a full download.


Legacy KB System (APS) Data: RESL164199 V1.0, Originally authored by on , Last Edited by on
Related ranges: Concept