Discover our Clipsal Smart Home packages as seen on The Block 2018

in location

OR

I'm looking for

  • Wholesalers
    • Uncheck All Check All
  • EXPERTISE
    • Expand
    • Expand
    • Expand
    • Uncheck All Check All
  • Switchboard Manufacturers
    • Uncheck All Check All
OR

The best way to see what Clipsal electric products can do for your home is seeing them in action at a Clipsal Display Centre.

Product stock may vary according to location. If you're after a specific product range, please check with your chosen location before visiting.

10 Results
    Load More Load Complete
    Change Location

    How do you import the tags from RSLogix5000 (.L5K file) in Vijeo Designer using the Link Variables feature?

    Issue

    How do you import the tags from RSLogix5000 (.L5K file) in Vijeo Designer using the Link Variables feature?

     

    Product Line

    Vijeo Designer, Magelis HMI

     

    Environment

    Configuration software in Windows PC

     

    Resolution

    Steps are as follows: 

    1) From RSLogix5000, you will need to re-save the project file as a .L5K file format. By going to the File menu and select Save As...


    2) From the Save As window, create a path and file name of where you want to save the file. Make sure you select .L5K as the file type then select Save

     

    3) In Vijeo Designer, create the Rockwell Ethernet IP Native driver. In this example, we show the CompactLogix PLC. Please select the Equipment item that matches your physical device.

     

    4) Input the IP address of the PLC that the HMI is communicating with on the Ethernet/IP network:

     

    5) Right-click on the Variables node and select Link Variables.

     

    6) From the Link Variables window, locate the path of the .L5K file that you have saved. Select File of Type as Rockwell L5K Files and Equipment name of the EIP driver you have created then click OK.

     

    7) From the New Variables from Equipment... dialog, select the tags you wish to import into Vijeo Designer. Under the When adding variables: option, select how you want to save the tag names and select add.

     

    8) Once the Linking of variables are complete, you will see all of the variables you have imported in the Variable Editor window.



    Tips:

    • To add more variables from the existing linked variables, right-click on the Variables node and choose "New Variables from Equipment...", this will bring up the tag selection screen.
    • To update the Linked variables to an .L5K file that is newly saved with the same name, right-click on the Variables node and  choose "Update link...", select the row representing the path of .L5K file that is linked and click the "Update" button.
    • To remove an existing Linked .L5K file, right-click on the Variables node, choose "Update Link...", select the row representing the path of the .L5K file that is linked and click the "Remove" button.
      • Delete the original Linked variables folder including it's sub-variables before linking a new .L5K file

    Didn’t find what you were looking for?

    Try Searching Again View Our Categories

    Need further assistance?

    Our Customer Care department provides total customer service solutions for our residential, industrial and commercial applications.

    Get Assistance