Discover our Clipsal Smart Home packages as seen on the Block

in location

OR

I'm looking for

  • Wholesalers
    • Uncheck All Check All
  • EXPERTISE
    • Expand
    • Expand
    • Expand
    • Uncheck All Check All
  • Switchboard Manufacturers
    • Uncheck All Check All
OR

The best way to see what Clipsal electric products can do for your home is seeing them in action at a Clipsal Display Centre.

Product stock may vary according to location. If you're after a specific product range, please check with your chosen location before visiting.

10 Results
    Load More Load Complete
    Change Location

    Power Monitoring Expert 8.2 - If 'Reconfigure' is run on an upgraded Engineering Client/Secondary Server, it will fail on the 'Import System Key' leaving the server unusable

    If an Engineering Client or a Secondary Server is upgraded to PME 8.2, and then subsequently, the installer is run in reconfigure mode, the reconfigure will fail at 'Import System Key'. When the this happens, the Engineering Client/Secondary Server will be rendered unusable. To recover, it is necessary to uninstall and reinstall PME.

    1. It is recommended that Engineering Clients not be upgraded, but rather uninstalled, and then the new version of PME installed. If this is done, this problem can be avoided.
    2. It is also possible to patch this problem by copying the attached file 'Security.Support.broker.xml' into the )\Schneider Electric\Power Monitoring Expert\Uninst_PowerMonitoringExpert\BrokerFragments folder, replacing the existing file. Once this is done, 'Reconfigure' will run correctly without errors.

    Note that this is a problem with upgraded systems ONLY.

    Didn’t find what you were looking for?

    Try Searching Again View Our Categories

    Need further assistance?

    Our Customer Care department provides total customer service solutions for our residential, industrial and commercial applications.

    Get Assistance