Discover our Clipsal Smart Home packages as seen on the Block

in location

OR

I'm looking for

  • Wholesalers
    • Uncheck All Check All
  • EXPERTISE
    • Expand
    • Expand
    • Expand
    • Uncheck All Check All
  • Switchboard Manufacturers
    • Uncheck All Check All
OR

The best way to see what Clipsal electric products can do for your home is seeing them in action at a Clipsal Display Centre.

Product stock may vary according to location. If you're after a specific product range, please check with your chosen location before visiting.

10 Results
    Load More Load Complete
    Change Location

    How do I load an SoMachine V4.1 application to a M241 controller via an SD card?

    1. Compile your project to make sure there is no error in the project. 

    2. In MyController--> PLC settings set the Starting Mode to "Start in Run". 

    3. Rebuid your project. 

    4. Go to Project Option and select Mass Storage. 

    5. In Mass Storage window click on Macros Button and select the option Download App. This will insert three script in Download action. 
    6. Again click on add new in Mass Storage to insert a new action. 

    7. Select this new action and from command drop down select the option Reboot. This will insert a new line in script as Reboot. 

    8. Make sure that your drive is formatted as FAT 32 format. 

    9. Click on Generate Button and give the path of the drive. 

    10. In Message window you will see the message as a Script was generated successfully. 

    11. Safely remove the drive from your system and insert it into the PLC, then power on the PLC. 

    12. You will notice that (SD/USB) LED will start blinking. This indicate that Program Transfer is in progress. 

    13. At the end you will notice indication that the transfer finished successfully (M258/LMC058 - USB LED becomes solid ON, M241/M251 - SD Card is Steady ON and ERR LED is flashing) 

    14. Do not power off the controller but remove the drive from PLC. This automatically execute an reboot command and you can notice the reboot action of PLC. 

    15. After successful reboot controller will remain in Stop Mode. 

    16. To Start the controller simply Power off the controller and power on again. This action will put controller in Run Mode as we have selected the option Start in Run for Start Mode.

    Didn’t find what you were looking for?

    Try Searching Again View Our Categories

    Need further assistance?

    Our Customer Care department provides total customer service solutions for our residential, industrial and commercial applications.

    Get Assistance