Discover our Clipsal Smart Home packages as seen on The Block 2018

in location

OR

I'm looking for

  • Wholesalers
    • Uncheck All Check All
  • EXPERTISE
    • Expand
    • Expand
    • Expand
    • Uncheck All Check All
  • Switchboard Manufacturers
    • Uncheck All Check All
OR

The best way to see what Clipsal electric products can do for your home is seeing them in action at a Clipsal Display Centre.

Product stock may vary according to location. If you're after a specific product range, please check with your chosen location before visiting.

10 Results
    Load More Load Complete
    Change Location

    Can I optimize the Programs in my Concept Hot Standby system without stopping the process?

    Yes.
    1. Set the command register bit 13 (allow user logic mismatch) in the Primary.
    2. Stop the Standby PLC , load the optimized project and place back into run.
    3. The Standby PLC should have come up in Standby mode. Verify that it did and force a switch over.
    4. Perform a key switch transfer from the new optimized Primary to the Standby.
    5. Verify that the standby is back online and force another switch over.
    6. Reset Command Register bit 13 back to 0.
    7. Verify that both the Primary and Standby PLCs are online.


    Legacy KB System (APS) Data: RESL212123 V1.0, Originally authored by DaSo on 07/24/2013, Last Edited by DaSo on 07/24/2013
    Related ranges: Concept

    Didn’t find what you were looking for?

    Try Searching Again View Our Categories

    Need further assistance?

    Our Customer Care department provides total customer service solutions for our residential, industrial and commercial applications.

    Get Assistance